Shane Smiths Tiler was having babies, well, his wife was anyway, so Shane stepped up to the plate himself, this is why his name is on the big sign out the front.
This is what happens when Plumbers arrive on Friday to do a job and don’t come back till the following Wednesday, of course, it f@%$@$% rains doesn’t it.
Mario Ghensi from Mareeba Floor Coverings supplied floor coverings and EK Kitchens from Cairns supplied Cabinetry. Premier Catering from Cairns supplied Cooking Gear and Range Hood.
Been a lot done since last post. Gyprock is up and has been Plastered. Datum Plastering have put the Gyprock up and Dallas Beazleigh was responsible for the smooth plastering.
The Plumbers have been busy doing what plumbers do.